Baldwin General Contracting
Client:Natural Point
Date:November 06, 2012

Natural Point CNC Shop

Baldwin General acted as construction manager and general contractor in the just completed second phase of our Natural Point corporate headquarters project. This 7000 square foot pre-engineered building and associated parking lot was built directly adjacent to the corporate headquarters building completed in 2010 and features a CMU wainscot with precast cap stones, rolling steel curtain doors, aluminum storefront windows, and a veneer plaster stucco finish. Inside are two levels of offices, restrooms, and a 6000 square foot staging, demonstration, and testing area with high bay storage. Mechanical – electrical scope includes 800amp service, packaged air handlers and automatic fire suppression.