Baldwin General Contracting
Client:AmeriTitle
Date:November 06, 2012

AmeriTitle

In addition to working with the owner’s interior design team on finishes selections, case work details and diagrammatic floor plans, Baldwin General teamed with the project architect in completing the mechanical, electrical, ADA restrooms and final permitting as a design / build component. Starting with a brown shell, power, domestic and fire water were home run from the existing mechanical room; existing under-slab waste lines were extended to the kitchen, break room and restrooms. Partition walls, HVAC, electrical, and plumbing were overlapped with finishes as a means to achieve guaranteed completion.